{
  "name": "ZEBRA BM-B04 Tile Leveling Clip Break-Force Demonstration Data",
  "version": "2026-10-15.1",
  "testDate": "2026-10-07",
  "reviewedOn": "2026-10-15",
  "source": "ZEBRA internal test video dated 2026-10-07",
  "canonicalPage": "https://zebratiling.com/products/tile-leveling-clips/",
  "citation": "ZEBRA TOOLS, BM-B04 Tile Leveling Clip Break-Force Demonstration Data, version 2026-10-15.1, reviewed 2026-10-15.",
  "model": "BM-B04",
  "material": "100% virgin PP",
  "gauge": "AILIGU digital force gauge",
  "conversion": "N = kgf × 9.80665",
  "boundary": "One filmed sample per thickness. Results describe this BM-B04 demonstration only; they are not batch averages, minimum guarantees, lot-acceptance limits, or a universal specification for ZEBRA clips. Gauge calibration certificate, pull speed, batch identifier and repeated-sample variation were not available in the video record.",
  "records": [
    {
      "model": "BM-B04",
      "thicknessMm": 1,
      "material": "100% virgin PP",
      "sampleNumber": 1,
      "peakLoadKgf": 28.1,
      "peakLoadN": 275.6,
      "method": "Clip held between upper and lower tensile fixtures; load increased with a hand-operated mechanism; retained peak read from the digital gauge after separation.",
      "evidenceStatus": "video-observed single-sample result"
    },
    {
      "model": "BM-B04",
      "thicknessMm": 1.5,
      "material": "100% virgin PP",
      "sampleNumber": 1,
      "peakLoadKgf": 29,
      "peakLoadN": 284.4,
      "method": "Clip held between upper and lower tensile fixtures; load increased with a hand-operated mechanism; retained peak read from the digital gauge after separation.",
      "evidenceStatus": "video-observed single-sample result"
    },
    {
      "model": "BM-B04",
      "thicknessMm": 2,
      "material": "100% virgin PP",
      "sampleNumber": 1,
      "peakLoadKgf": 37.1,
      "peakLoadN": 363.8,
      "method": "Clip held between upper and lower tensile fixtures; load increased with a hand-operated mechanism; retained peak read from the digital gauge after separation.",
      "evidenceStatus": "video-observed single-sample result"
    },
    {
      "model": "BM-B04",
      "thicknessMm": 2.5,
      "material": "100% virgin PP",
      "sampleNumber": 1,
      "peakLoadKgf": 37.7,
      "peakLoadN": 369.7,
      "method": "Clip held between upper and lower tensile fixtures; load increased with a hand-operated mechanism; retained peak read from the digital gauge after separation.",
      "evidenceStatus": "video-observed single-sample result"
    },
    {
      "model": "BM-B04",
      "thicknessMm": 3,
      "material": "100% virgin PP",
      "sampleNumber": 1,
      "peakLoadKgf": 41.7,
      "peakLoadN": 408.9,
      "method": "Clip held between upper and lower tensile fixtures; load increased with a hand-operated mechanism; retained peak read from the digital gauge after separation.",
      "evidenceStatus": "video-observed single-sample result"
    }
  ]
}